5 thoughts on “How to apply for sewage discharge permit”

  1. The pollutant discharge permit refers to the submissions of the pollution unit to the environmental protection administrative department, and the environmental protection administrative department will be issued by the competent administrative department of environmental protection. The pollution license is an important part of the environmental protection license and is widely used. The pollution license system refers to the general term stipulated in the application, review, issuance, suspension, revocation, supervision and management, and penalties of the application, review, issuance, suspension, revocation, supervision and management of pollution permits.
    This pollution discharge permits need to provide the following documents: the application form and application documents, the environmental impact assessment approved document of the construction project, the copy of the environmental protection acceptance opinion of the construction project, the sudden issuance of the environmental protection administrative department A copy of the registration form for emergency plans for environmental incidents, a copy of the monitoring report in the past one year (except for new projects); copying of the registration statistics of pollutants in the past one year (removal of new projects) enterprise business licenses and corresponding production and operations Copy of qualifications, as well as instructions for production capabilities, processes, equipment, products meet the requirements of the national and local industrial policies, photos of sewage outlets, etc.

    The pollution permit system is the basic system of environmental management that covers all fixed pollution sources. The pollution license is the only administrative license for discharge behavior during the production and operation period of pollution discharge units.
    The following pollutant discharge units shall implement pollution permit management:
    (1) Emperor enterprise institutions of toxic and harmful air pollutants published by industrial exhaust gas or discharged by the state;
    (2) central heating facilities Coal -fired heat source production and operation units;
    (3) Enterprises and institutions and other production operators that directly or indirectly discharge industrial wastewater and medical sewage to water body;
    (4) Operation of centralized processing facilities in urban sewage Units;
    (5) Large -scale livestock and poultry farms with sewage discharge ports;
    (6) Other pollutant discharge units managed by sewage permits in accordance with the law.
    web links

  2. According to the "Regulations on the Management of Sewage Discharge Licensing"
    The pollutants who apply for pollutant discharge permits for new projects, the following conditions shall be available:
    (1) The environmental impact evaluation documents of the construction project are approved by the environmental protection administrative department or re -reinstated Audit and approval;
    (2) There are pollution prevention facilities or measures that have passed the acceptance of environmental protection administrative departments;
    (3) management systems and technical capabilities that maintain the normal operation of pollution prevention facilities; For running orders
    , the operating qualification certificate of environmental pollution control facilities shall be obtained;
    (4) Emergency plans and facilities and equipment with emergencies in response to emergencies;
    (5) discharge pollutants Meet the requirements for the acceptance of environmental protection administrative departments;
    (6) Other conditions stipulated in laws and regulations.
    The pollutants who apply for pollutant discharge permit for the new project shall fill in the application form of the pollution discharge permit and submit the business license of the industrial and commercial business
    and the (2) item (3), the fourth (fourth) (fourth) (fourth) (fourth) (fourth) (fourth) (fourth) (fourth) (fourth) (fourth) (fourth) ) Proof materials for items (5).
    If existing pollutants to apply for pollution discharge permits, the following conditions shall be available:
    (1) production capacity, process, equipment, and products meet the current industrial policy requirements of the country and local and local and local.
    (2) Pollution prevention facilities and pollutant treatment capabilities that meet the standards and requirements of the state and local regulations. If the facility commission
    operations, the operating unit shall obtain the operating qualification certificate for environmental pollution control facilities; There are standardized sewage ports;
    (4) The sewage discharge of the automatic monitoring instrument should be installed in accordance with the regulations, and the automatic monitoring instrument has been installed in accordance with national standards and regulating An
    ) The discharge pollutants meet the requirements of the total control indicators of the total amount of pollutant emissions in the environmental function area and the regional region;
    (6) There are environmental protection management systems and pollution prevention measures (including emergency measures);
    (7) There are legal qualifications for production and operation;
    (8) Other conditions stipulated in laws and regulations.
    The application for pollution discharge permits for existing pollutants shall fill in the application form of pollution discharge permits and submit the business license of the industrial and commercial business. ), (6) proof of item.

  3. Pay content for time limit to check for freenAnswer: For the first time, the pollutant discharge units that apply for sewage discharge permits, or temporary pollution permits are replaced with formal pollution permits, the following materials must be submitted: 1. Application reports to apply for pollution permits. 2. Application for application for pollution licenses. 3. Environmental protection facilities are completed and accepted document materials. New, reform, expansion and technical transformation projects shall submit trial production and trial operation approval documents. 4. Preventive discharge monitoring reports issued by environmental monitoring agencies issued by the provincial municipality within nearly 6 months. 5. The discharge port is standardized and the acceptance materials shall be installed. If the automatic monitoring device shall be installed with pollutants shall be installed, the acceptance material for the automatic monitoring device shall be submitted. 6. Emissions registration materials approved by the competent environmental protection department of the provincial municipality. 7. The total control indicators of pollutant emissions determined by the local government or environmental protection authority. 8. The notice of paying the sewage fee and the "general payment letter" will be counted. 9. The issuance of opinions and approval documents issued by the local environmental protection department, including the control indicators of total pollutant discharge of various types of pollutants, the limit of emission concentration, discharge direction, and the type of pollution permit issuance. 10. Environmental management regulations, pollution prevention and control facilities, management procedures, and emergency plans such as pollution accidents. Legal basis: Article 6 of the "Regulations on the Management of the People's Republic of China" Article 6 of the sewage discharge unit shall apply to the ecological environment authority of the local people's government at or above the municipal level where it is located in the place where it is produced and operated. Article 7 Application for obtaining pollutant discharge permits may submit an application form for pollution discharge permits through the national pollution license management information platform, or it may be submitted by letter and other methods. The application form of the pollution license permit shall include the following items: (1) information such as the name of the pollution unit, the residence, the legal representative or the main person in charge, the location of the production and operation venue, and the unified social credit code; ) Approved documents or environmental impact registration forms for filing; (3) According to the type, discharge concentration and emissions of pollutant emissions, discharge concentrations and emissions of pollutant emissions in accordance with pollutant discharge ports, main production facilities or workshops and factory circles The total amount of object emission control indicators; (4) the location and quantity of pollution prevention facilities, the location and quantity of the discharge port of pollutants, the discharge method, discharge direction, and self -monitoring scheme of pollutants; Auxiliary materials, production and discharge pollutants and other information, and whether it involves business secrets, which is not suitable for disclosure.

  4. In Tai'an City, Shandong Province, go directly to the local construction committee window, fill in the form, and write a pollution application; because the window is more familiar with the window, the window is directly attached to the office of the city's sewage management office, and the head of the family section will come to the scene. The certificate of a week or so is the five -year period; I encountered some trouble when digging the sewage pipe, because it was relatively long, and the green land for the walking had to run a trip to the garden bureau and completed the temporary occupation of green land procedures. Finally When I encountered a problem again, because I wanted to break the asphalt road and sidewalk, and ran a trip to the municipal window, approved, and took the formalities to the Public Economic Administration, signed, paid deposits, buried pipes, restored the road surface, restored the pavement, and resumed the pavement.

  5. Enterprises with pollution control facilities must handle the "Poiligo License", and the Environmental Protection Agency will be clearly clarified in the content of the "Environmental Protection and Approval Opinions of Construction Projects". Within 3 months of trial production, the enterprise must submit the "Sewage Email Application Form" to the local environmental protection department, and at the same time entrusts the local environmental monitoring center station to monitor and accepts. Essence

Leave a Comment